Once a sprawling estate of high rise 1960’s tower blocks, the creation of Erith Park has transformed the area and now provides 343 new homes for local residents.

Promech were contracted to install a site wide district heating system serving four separate low rise blocks containing 203 one, two and three bedroom apartments and to install all the internal services as part of a shell and core and fit out package worth in excess of 3 million pounds.  One hundred and forty houses were constructed under a separate contract and did not form part of our works.

The 203 flats, a mixture of affordable, shared ownership and for sale properties, are all finished to a high standard and the external designs are very pleasing to the eye.

Promech installed an energy centre to provide for the heating requirements of the apartments.  Comprising of 6no 400kw MHS gas boilers, three SAV Loadtracker CHP units, a series of Grundfos pumps, the energy centre will also provide for two new blocks once constructed under the phase two contract, scheduled to commence in late spring 2015.  Promech installed a full controls and building management system giving the facility for remote control, monitoring and interrogation of all elements of the system.

Inside the apartments, Evinox heating interface units were specified to provide heating and hot water.  The room heating was provided by panel radiators and all the properties had two room controllers linked to the hiu’s.

A range of modern sanitary ware was provided by Promech to compliment the contemporary surroundings.