Britannia Music Site in Ilford is being carried out by the builders Durkan, and on completion will be handed over to investment group M&G.

With a total number of 354 dwellings complete with the installation of all infrastructural mechanical works, Britannia Music Site is Promech's largest project to date.

Promech were awarded the full mechanical contract for Britannia Music Site in May of 2017, and we were first given the task of taking the design of the mechanical works forward to construction.

A comprehensive drainage system with P100, P50 and P.A.P.A valves, provided by Terrain on behalf of Alia Axis has been installed. This system reduces the number of penetrations through the roof spaces of the building making a more aesthetically pleasing finish without reducing functionality of a vented drainage system.

The rainwater from the podium space is also collected and tops-up a rainwater harvesting system, which helps reduce the amount of water the building uses and helps with the compliance to Code for Sustainable Homes.

Further works on the infrastructure include a suitably built energy centre complete with CHP installation, BMS Controls, AOV & Environmentally controlled ventilation systems, CAT5 water services to bin stores, Wet riser in the 21 storey tower, dry risers and the distribution of LTHW and BCW pipework throughout.

The apartments have installed individual Heat Interface Units with integrated Guru payment system, sprinkler systems in Blocks C and D, domestic water services to sanitary plumbing and the heating is carried out in panel radiators.

 